manufacturers logos       
               

QUICKLINKS

SHOPPING CART

Shopping cart  Shopping cart
0 Product(s) in cart
Total $0.00
» Checkout

RETURN POLICY

-> A restocking fee may to all returns and exchanges.

-> Refunds require original invoice/receipt within 30 days of purchase.

-> No refunds on installed products.

-> No refunds on special order products.

-> No refunds on electrical products.

MOORAGE AVAILABLE

Multnomah Yacht Harbor offers covered/uncovered moorage and trailer storage. CONTACT US FOR SLIP AVAILABILITY AND RATES.

CONTACT US

503-737-1651

sales@myharbor.com

moorage@myharbor.com

repair@myharbor.com

PLEASE CALL US FOR CURRENT PRICING AT 503-737-1651 

Labor
Technical Work - plumbing, fiberglass, wood, rigging $100/hr
Mechanical - electrical and welding $115-$125/hr

Mobile /Offsite Work (Ask for Estimate)


Haul to/ from and Blocking on Stands
Haul Out and Launch (includes round trip +1 lay day) $325 minimum charge 
Under 45’ LOA                    $11.50/ft +
Over 45’ LOA                      $12.50/ft +
Over 65’ LOA                      $14.50/ft +
Plus Blocking On Stands  $75 / $150
  (40’ and Up $150)
Some vessels may have additional charges for special needs; blocking, straps, or pads.

Survey Haul Out (2 hr Hang Time)
**pressure wash additional
Under 30' (2 slings)                       $250
30’ - 45’ (2 slings)                          $375
*additional slings (if required) +  $100
46’ - 60’ (4 slings)                          $425
Over 60' (4 slings)                         $550+

Haul Vessel to/ from Truck
See Survey Haul Out prices
*Plus Pressure Wash and Environmental Fee Required

Bottom Paint with Haul Out Package
Includes round trip haul out, pressure washing, tarping and blocking. 1 coat of bottom paint & materialsstandard prep & associated lay days. Additional work such as blisters, will incur additional charge. ($1155 min. charge).  *Additional Paints Available  
Pettit Trinidad  SR , Vivid & Ultima SR      $38.50/ft + env. fee
**Second Coat Option Additional, ask for pricing

Barrier Coat Package
Specializing in Aluminum and Fiberglass. Includes Bottom Paint.  *ask for estimate
 

Environmental Fee
all vessels (flat fee)      $59

Lay Days
*no charge while MYR is working on vessel
Short and Long Term available                                    *call for pricing

Mast Load to Trailer                          $75-$135


Mast Stepping / Un-Stepping 
(in water)      *call for pricing
Rigging Services

Moorage 
Temporary for Repair Customers           $25/day

Deluxe Detailing                                       $27 - $30+ / lineal foot

Professional Buff and Wax using 3 pass process with the very best materials from water line to rail.
*Topside buff/wax estimated upon inspection

Hazardous Waste Disposal Fee             $2.25 / gal


Outside Contractors Fee                        $35 / hr

Must be pre-approved and have business license and liability insurance.  

Emergency Services                               $150 / hr

Salvage Haul Outside Business Hours (min. charge per hour)